版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
作者机构:School of Mechanical and Transportation EngineeringChina University of PetroleumBeijing102249China School of Safety and Ocean EngineeringChina University of PetroleumBeijing102249China Key Laboratory of Oil and Gas Production Safety and Emergency TechnologyMinistry of Emergency ManagementBeijing102249China
出 版 物:《Petroleum Science》 (石油科学(英文版))
年 卷 期:2023年第20卷第4期
页 面:2442-2451页
核心收录:
学科分类:0820[工学-石油与天然气工程] 08[工学] 082002[工学-油气田开发工程]
主 题:Double-V ram Blowout preventer Shear force assessment Moving state shearing Finite element analysis Shear test under pressure
摘 要:As the“throatof the drilling well control system,ram blowout preventers(BOPs)can effectively prevent blowout ***,the ram shear mechanism under complex working conditions is unclear,and it is difficult to evaluate the ram BOP shear force,leading to frequent shear failure accidents in *** at the above problems,this paper takes the double-V ram BOP as the research object,and integrates the methods of theoretical analysis,simulation modeling,and test verification to analyze the shear force in the pipe shear process under both static and moving conditions.A ram BOP shear force evaluation method is proposed based on equivalent ***,by comparing with calculation data and experimental data,the error between them is less than 5%,demonstrating the applicability and effectiveness of the proposed *** research results can provide a theoretical basis for oilfield operations of ram BOPs.