版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
作者机构:Dept. of Electronic and Electrical Engineering Keimyung University Korea Republic of Dept. of Robot Engineering Keimyung University Korea Republic of Dept. of Electrical Energy Engineering Keimyung University Korea Republic of
出 版 物:《Transactions of the Korean Institute of Electrical Engineers》 (Trans. Korean Inst. Electr. Eng.)
年 卷 期:2023年第72卷第2期
页 面:176-182页
核心收录:
主 题:Hydroelectric power plants
摘 要:As renewable energy has been rapidly increasing, as renewable power outgrows load demand, power system reliability becomes a major issue. The ultimate solution for this issue is to store surplus energy without curtailment. Among the energy storage technology, P2G(Power-to-Gas) that convert and store surplus energy into hydrogen in MES(Multi Energy System) is the most resonable solution. In addition, it is more economical feasible when using electrolyzer connected hydro power plant. For stable electrolyzer operation, In this paper, we derive scheduling by considering the operating characteristics of the electrolyzer. And we estimate the optimal capacity of ESS, electrolyzer connected hydro power usint optimization. As a result of the simulation, the NPV(Net Present Value) is maximum when the capacity of the electrolyzer is 265 kW. Copyright ©The Korean Institute of Electrical Engineers.