咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >PERT Scheduling with Resource ... 收藏

PERT Scheduling with Resource Constraints Using Qualitative Simulation Graphs

作     者:Ricki G. Ingalls Douglas J. Morrice 

作者机构:School of Industrial Engineering and Management Oklahoma State University Stillwater OK 74078 Management Science and Information Systems Department The University of Texas at Austin Austin TX 78712 

出 版 物:《Project Management Journal》 

年 卷 期:2004年第35卷第3期

页      面:5 - 14页

学科分类:12[管理学] 120202[管理学-企业管理(含:财务管理、市场营销、人力资源管理)] 0202[经济学-应用经济学] 02[经济学] 1202[管理学-工商管理] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 

主  题:PERT Scheduling Resource-Constrained Project Scheduling Qualitative Simulation Graphs Qualitative Discrete-Event Simulation 

摘      要:The Qualitative Simulation Graph Methodology (QSGM) is well suited to address the Program Evaluation and Review Technique (PERT) scheduling-with-resources problem. In QSGM, all possible scenarios are characterized in the problem. This is called the coverage property. The coverage property of QSGM has two important implications for the PERT scheduling problem. First, it means that all possible schedules are represented. Second, it means that the model can characterize all possible outcomes of a decision that needs to be made in the schedule. This gives rise to the possibility of robust scheduling decisions without the need to rerun the schedule because actual activity durations differ from estimated activity durations.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分