咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >A copula-based fuzzy chance-co... 收藏

A copula-based fuzzy chance-constrained programming model and its application to electric power generation systems planning

一个基于性交的模糊抑制机会的编程模型和它的申请到电力产生系统计划

作     者:Chen, F. Huang, G. H. Fan, Y. R. Chen, J. P. 

作者机构:Univ Regina Fac Engn Regina SK S4S 0A2 Canada Univ Regina UR NCEPU Inst Energy Environm & Sustainabil Res Regina SK S4S 0A2 Canada North China Elect Power Univ Inst Energy Environm & Sustainabil Res UR NCEPU Beijing 102206 Peoples R China 

出 版 物:《APPLIED ENERGY》 (实用能源)

年 卷 期:2017年第187卷

页      面:291-309页

核心收录:

学科分类:0820[工学-石油与天然气工程] 0817[工学-化学工程与技术] 08[工学] 0807[工学-动力工程及工程热物理] 

基  金:Program for Innovative Research Team in University [IRT1127] 111 Project [B14008] Natural Science and Engineering Research Council of Canada 

主  题:Copula Joint-probabilistic constrained programming Generalized fuzzy linear programming Multiple uncertainties Electric power generation systems planning 

摘      要:This study developed a copula-based fuzzy chance-constrained programming (CFCCP) model and applied it to electric power generation systems planning under multiple uncertainties. The CFCCP model was formulated by incorporating existing joint-probabilistic constrained programming and generalized fuzzy linear programming techniques within a general mixed-integer linear programming framework. The CFCCP model can not only effectively reflect uncertain interactions among random variables even when the random variables follow different probability distributions and have previously unknown correlations, but can also provide information about the membership grades for the decision variables and objective-function values. Thus, it would have a wider application scope than existing optimization models for power generation systems planking. Its applicability has been demonstrated through a case study of electric power generation planning within a region of North China. As a result, fuzzy interval solutions related to power generation and capacity expansion patterns of electricity-generation facilities, and primary energy supply structures were generated within six scenarios of constraint-violation levels under different a-cut levels. The results are helpful to investigate dynamic features of the regional power generation system, identify desired decision alternatives, and analyze the influences of interactions among multiple uncertainties on system outputs. (C) 2016 Elsevier Ltd. All rights reserved.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分