版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
作者机构:Mazandaran Univ Sci & Technol Dept Ind Engn Babol Sar Iran Iran Univ Sci & Technol Dept Ind Engn Tehran Iran Sharif Univ Technol Dept Ind Engn Tehran Iran Univ Tehran Dept Ind Engn Fac Engn Tehran Iran Sharif Univ Technol Dept Math Sci Tehran Iran
出 版 物:《JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS》 (佛兰克林学会杂志)
年 卷 期:2008年第345卷第5期
页 面:452-467页
核心收录:
学科分类:0808[工学-电气工程] 07[理学] 08[工学] 0701[理学-数学] 0811[工学-控制科学与工程]
基 金:Research Council & Sharif University of Technology Iran National Science Foundation, INSF
主 题:no-wait flow shop scheduling multi-objective linear programming fuzzy multi-objective linear programming decision maker
摘 要:This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker s overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.