咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Flexibility Scheduling for Lar... 收藏

Flexibility Scheduling for Large Customers

为大顾客安排的灵活性

作     者:Angizeh, Farhad Parvania, Masood Fotuhi-Firuzabad, Mahmud Rajabi-Ghahnavieh, Abbas 

作者机构:Univ Utah Dept Elect & Comp Engn Salt Lake City UT 84112 USA Sharif Univ Technol Ctr Excellence Power Syst Control & Management Elect Engn Dept Tehran 11369363 Iran Sharif Univ Technol Dept Energy Engn Tehran 11369363 Iran 

出 版 物:《IEEE TRANSACTIONS ON SMART GRID》 (IEEE智能电网汇刊)

年 卷 期:2019年第10卷第1期

页      面:371-379页

核心收录:

学科分类:0808[工学-电气工程] 08[工学] 

基  金:U.S. National Science Foundation [ECCS-1549924] Iran National Science Foundation 

主  题:Demand response flexible load energy storage systems onsite generation energy procurement large customers mixed-integer linear programming 

摘      要:Large customers are considered as major flexible electricity demands which can reduce their electricity casts by choosing appropriate strategies to participate in demand response programs. However, practical methods to aid the large customers for handling the complex decision making process for participating in the programs have remained scarce. This paper proposes a novel decision-making tool for enabling large customers to determine how they adjust their electricity usage from normal consumption patterns in expectation of gaining profit in response to changes in prices and incentive payments offered by the system operators. The proposed model, formulated as a mixed-integer linear programming problem, simultaneously determines the optimal integration of the flexibility options including flexible load rescheduling and utilizing onsite generation and energy storage systems, along with energy procurement from the grid that allows the large customers to optimize their energy portfolio from different sources including bilateral contracts and the market. The characteristics of the proposed integrated flexibility scheduling and energy procurement model and its benefits are investigated through several case studies conducted on a test large industrial load.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分