咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Synergistic gains from the mul... 收藏

Synergistic gains from the multi-objective optimal operation of cascade reservoirs in the Upper Yellow River basin

作     者:Bai, Tao Chang, Jian-xia Chang, Fi-John Huang, Qiang Wang, Yi-min Chen, Guang-sheng 

作者机构:Xian Univ Technol State Key Lab Base Ecohydraul Engn Arid Area Xian Shaan Xi Peoples R China Natl Taiwan Univ Dept Bioenvironm Syst Engn Taipei 10617 Taiwan 

出 版 物:《JOURNAL OF HYDROLOGY》 (J. Hydrol.)

年 卷 期:2015年第523卷

页      面:758-767页

核心收录:

学科分类:08[工学] 0708[理学-地球物理学] 081501[工学-水文学及水资源] 0815[工学-水利工程] 0814[工学-土木工程] 

基  金:project entitled State Key Laboratory Base of Eco-Hydraulic Engineering in Arid Area, National Basic Research Program of China [2011CB403302] National Natural Science Foundation of China [51409210, 51179149] Ministry of Science and Technology (MOST), Taiwan [101-2923-B-002-001-MY3] 

主  题:Synergistic gains Cascade reservoirs Multi-objective optimal operation Progressive Optimality Algorithm-Dynamic Programming Successive Approximation (POA-DPSA) 

摘      要:The Yellow River, known as China s mother river, originates from the Qinghai-Tibet Plateau and flows through nine provinces with a basin area of 0.75 million km(2) and an annual runoff of 53.5 billion m(3). In the last decades, a series of reservoirs have been constructed and operated along the Upper Yellow River for hydropower generation, flood and ice control, and water resources management. However, these reservoirs are managed by different institutions, and the gains owing to the joint operation of reservoirs are neither clear nor recognized, which prohibits the applicability of reservoir joint operation. To inspire the incentive of joint operation, the contribution of reservoirs to joint operation needs to be quantified. This study investigates the synergistic gains from the optimal joint operation of two pivotal reservoirs (i.e., Longyangxia and Liujiaxia) along the Upper Yellow River. Synergistic gains of optimal joint operation are analyzed based on three scenarios: (1) neither reservoir participates in flow regulation;(2) one reservoir (i.e., Liujiaxia) participates in flow regulation;and (3) both reservoirs participate in flow regulation. We develop a multi-objective optimal operation model of cascade reservoirs by implementing the Progressive Optimality Algorithm-Dynamic Programming Successive Approximation (POA-DPSA) method for estimating the gains of reservoirs based on long series data (1987-2010). The results demonstrate that the optimal joint operation of both reservoirs can increase the amount of hydropower generation to 1.307 billion kW h/year (about 594 million USD) and increase the amount of water supply to 36.57 billion m(3)/year (about 15% improvement). Furthermore both pivotal reservoirs play an extremely essential role to ensure the safety of downstream regions for ice and flood management, and to significantly increase the minimum flow in the Upper Yellow River during dry periods. Therefore, the synergistic gains of both reservoirs can be

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分