咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >An optimal two-processor sched... 收藏

An optimal two-processor scheduling for a class of SWITCH-less program nets with combined OR-nodes

作     者:Ge, QW 

作者机构:Yamaguchi Univ Fac Educ Yamaguchi 7538513 Japan 

出 版 物:《IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES》 (IEICE Trans Fund Electron Commun Comput Sci)

年 卷 期:2002年第E85A卷第6期

页      面:1274-1280页

核心收录:

学科分类:0808[工学-电气工程] 0809[工学-电子科学与技术(可授工学、理学学位)] 08[工学] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

主  题:program net two-processor scheduling hybrid priority list combined OR-node optimality 

摘      要:This paper deals with two-processor nonpreemptive scheduling problem for acyclic SWITCH-less program nets including two types of nodes: AND-node and OR-node. Compared with task graphs that are a special case of acyclic SWITCH-less program nets and include only AND-nodes, the multiprocessor scheduling problem of general acyclic SWITCH-less program nets is more complicated. Since multiprocessor scheduling problem for general task graphs is NP-hard, so is for acyclic SWITCH-less program nets generally. In this paper, we suppose the acyclic SWITCH-less program nets satisfy: (i) each AND-node and OR-node have 1 and 0 node firing time, respectively;(ii) each AND-node possesses single input edge. For such a class of acyclic SWITCH-less program nets, we first propose a hybrid priority list L that consists of both dynamic and static sub-lists. Then we prove that, for a given acyclic SWITCH-less program net to be executed by two identical processors, the schedule generated by L is optimal.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分