版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
作者机构:North China Elect Power Univ Sch Econ & Management Beijing Peoples R China
出 版 物:《INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS》 (国际电力与能源系统杂志)
年 卷 期:2016年第82卷
页 面:373-381页
核心收录:
主 题:Large-scale power failures Distribution network rush repair Task scheduling Multi-objective model SA algorithm
摘 要:This paper focuses on the emergency rush-repair task scheduling of distribution networks in power grid emergencies. As there are many characteristics in distribution network emergency rush-repair such as large number of rush repair points, diverse but with limited repair resources and urgent repair time, this paper takes constraint conditions, such as a variety of execution modes and repair resources into consideration during the model building process of the emergency rush repair scheduling, and we study emergency repair strategies, such as using the emergency generator vehicle, nearby repair strategy and ordinary repair strategy. In order to obtain the optimal solution and satisfy the constraints of the distribution network repair model, this paper improves the traditional serial schedule generation mechanism to a distribution network repair serial schedule generation mechanism by using improved SA algorithm and hierarchical optimization method to search the optimal solution. Finally, we use the model to an example and analyze it. It is validated that the two schedule generation mechanisms that use nearby repair strategy and ordinary repair strategy are both effective. Both the advantages and disadvantages of two mechanisms, and the feasibility and rationality of the model are analyzed in this paper. (C) 2016 Elsevier Ltd. All rights reserved.