版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
出 版 物:《World Oil》 (World Oil)
年 卷 期:1970年第170卷第7期
页 面:70-74页
核心收录:
学科分类:0820[工学-石油与天然气工程] 08[工学]
摘 要:Serious drilling, completion and producing problems result when trying to develop reservoirs with sour gas strong enough to part high strength drill pipe in 4 1/2 hr. Most difficulties can be overcome, however, by paying close attention to metallurgy of tubular goods, design of tubing and casing joints, elimination of sulfur plugging, and safety.