版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
作者机构:Univ Texas Austin Dept Civil Architectural & Environm Engn 301 E Dean Keeton St C1752 Austin TX 78712 USA Univ Texas Austin Dept Civil Architectural & Environm Engn Construct Engn & Project Management Program 301 E Dean Keeton St C1752 Austin TX 78712 USA
出 版 物:《WASTE MANAGEMENT》 (废物管理)
年 卷 期:2020年第116卷
页 面:79-90页
核心收录:
学科分类:0830[工学-环境科学与工程(可授工学、理学、农学学位)] 08[工学]
基 金:Green Fund initiative at the University of Texas at Austin
主 题:4D-BIM Building information modeling (BIM) Construction waste Reuse Recycle
摘 要:Despite pressing attention on construction waste management (CWM) issues, low rates of construction waste (CW) reuse and recycling (R&R) remain a limitation in construction projects. In recent years, Building Information Modeling (BIM) has gained momentum for CWM purposes;its data-richness, visualization, and simulation capabilities provide an opportunity to enhance CW R&R planning at the project level. In this context, this study proposes temporal-based algorithms integrated with 4D-BIM for the planning of concrete and drywall waste R&R throughout construction projects. Two case studies from Central Texas were used for the demonstration of the algorithms, and estimates were validated with ground truth data and literature values from different projects in North America. The overarching objective of the proposed algorithms is to streamline estimation and visual planning of CW for on-site reuse, and off-site recycling - therefore promoting a more proactive and schedule-based CWM plan. In addition, the approach improves team communication around CWM goals of the project. Moreover, through the use of 4D-BIM, on-site waste reuse opportunities are planned in advance, thus, improving resource recovery and minimizing waste disposal in landfills. (C) 2020 Elsevier Ltd. All rights reserved.