Few existing methods can simultaneously confirm sequence shortest and operation time minimum of target parts disassembly for retired products. Aiming to filling this research gap, this paper proposes a cooperative co-...
详细信息
Few existing methods can simultaneously confirm sequence shortest and operation time minimum of target parts disassembly for retired products. Aiming to filling this research gap, this paper proposes a cooperative co-evolution (CC) and data mining (DM) based method for planningdisassemblysequence and estimating operation time, in which CC is used to search the shortest disassemblysequence (SDS). Modular Arrangement of Pre-determined Time Standard (MOD) is employed to estimate the operation time of SDS, then DM is used to further adjust this operation time. A real-world use case verified the effectiveness of the proposed method.
暂无评论