A simple approach is formulated to predict the elastic, kinematic pile bending during harmonic or transient excitation for a circular pile (rather than a simplified thin strip). The kinematic response of a pile embedd...
详细信息
A simple approach is formulated to predict the elastic, kinematic pile bending during harmonic or transient excitation for a circular pile (rather than a simplified thin strip). The kinematic response of a pile embedded in two-layer soil is resolved in the frequency domain caused by the upward propagation of shear waves from the underlying bedrock. The simplified approach is generally valid to nonhomogeneous soil profiles, in light of the good comparison with the dynamic FE method and BDWF solution. It employs the soil-displacement-influence coefficients I-s to consider the pile-soil interaction (resembling the spring constant k(x) in the BDWF) and provides conservative estimations of maximum kinematic bending moments at the soil-layer interface (with a sharper stiffness contrast). The accuracy of the approach may be improved by incorporating the interaction of soil into the soil-displacement-influence coefficients I-s for such cases with V-b/V-a < 3.
This paper evaluates a simple approximate pseudostatic method for estimating the maximum internal forces and horizontal displacements of pile group subjected to lateral seismic excitation. The method involves two main...
详细信息
This paper evaluates a simple approximate pseudostatic method for estimating the maximum internal forces and horizontal displacements of pile group subjected to lateral seismic excitation. The method involves two main steps: (1) computation of the free-field soil movements caused by the earthquake, and (2) the analysis of the response of the pile group based on the maximum free-field soil movements (considered as static movements) as well as a static loading at the pile head, which depends on the computed spectral acceleration of the structure being supported. The methodology takes into account the effects of group interaction and soil yielding at pile-soil interface. The applicability of this approach has been validated by a similar approach for single piles and then verified by both experimental centrifuge models of pile-supported structures and field measurements of Ohba-Ohashi Bridge in Japan. It is demonstrated that the proposed method yields reasonable estimates of the pile maximum moment, shear, and horizontal displacement for many practical cases despite of its simplicity. Limitations and reliability of the methodology are discussed and some practical conclusions on the performance of the proposed approach are presented. (C) 2009 Elsevier Ltd. All rights reserved.
This paper presents a simple approximate pseudostatic method for estimating the maximum internal forces and horizontal displacements of a pile group located in a soil slope. The method is extension of an existing simi...
详细信息
This paper presents a simple approximate pseudostatic method for estimating the maximum internal forces and horizontal displacements of a pile group located in a soil slope. The method is extension of an existing similar method developed by the authors for the case of a horizontal ground surface. The method employed for horizontal ground case involves two main steps: first, the free-field soil movements caused by the earthquake are computed;Then, the response of the pile group is analyzed based on the maximum free-field soil movements as static movements, as well as a static loading at the pile head, which depends on the computed spectral acceleration of the structure being supported. This newly developed methodology takes into account the effects of group interaction and soil yielding. Simple modifications are applied to take into account the effect of slope on seismic deformations of the pile group, making use of the Newmark sliding block method. The applicability of the approach and the developed program is verified by comparisons made with both experimental shaking table tests and the results of a more refined analysis of a pile-supported wharf. It is demonstrated that the proposed method yields reasonable estimates of the pile maximum moment and horizontal displacement for many practical cases, despite its relative simplicity. The simplifying assumptions and the limitations as well as reliability of the methodology are discussed, and some practical conclusions on the performance of the proposed approach are suggested.
暂无评论