In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabil...
详细信息
In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the parameters as independent normal random variables. The deterministic problem has been computed with two different methods, namely weighting method and fuzzyprogrammingmethod. Finally, the integralsolution obtained by these two methods have been compared.
暂无评论