版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
T=题名(书名、题名),A=作者(责任者),K=主题词,P=出版物名称,PU=出版社名称,O=机构(作者单位、学位授予单位、专利申请人),L=中图分类号,C=学科分类号,U=全部字段,Y=年(出版发行年、学位年度、标准发布年)
AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
范例一:(K=图书馆学 OR K=情报学) AND A=范并思 AND Y=1982-2016
范例二:P=计算机应用与软件 AND (U=C++ OR U=Basic) NOT K=Visual AND Y=2011-2016
Precisely, the problem we focus on deals with power supplying that has become a more and more complex and crucial question. Many international companies have customers who are located all around the world; usually one customer per country. At the other side of the scale, power extraction or production is done in several sites that are spread on several continents and seas. A strong willing of becoming less energetically-dependent has lead many governments to increase the diversity of supply locations. For each kind of energy, many countries expect to deal ideally with 2 or 3 location sites. As a decrease in power supply can have serious consequences for the economic performance of a whole country, companies prefer to balance equally the production rate among all sites as the reliability of all the sites is considered to be very similar. Sharing equally the demand between the 2 or 3 sites assigned to a given area is the most common way. Despite the cost of the network has an importance, it is also crucial to balance the loading between the sites to guarantee that no site would take more importance than the others for a given area. In case an accident happens in a site or in case technical problems do not permit to satisfy the demand assigned to the site, the overall power supply of this site is still likely to be ensured by the one or two available remaining site(s). It is common to assign a cost per open power plant and another cost that depends on the distance between the factory or power extraction point and the
电话和邮箱必须正确填写,我们会与您联系确认。
版权所有:内蒙古大学图书馆 技术提供:维普资讯• 智图
内蒙古自治区呼和浩特市赛罕区大学西街235号 邮编: 010021
暂无评论