There is a big gap between theoretical research and practical application of reference network planning. Most of the existing planning models in academic research take cost as the objective function. Although various ...
详细信息
ISBN:
(纸本)9798350349047;9798350349030
There is a big gap between theoretical research and practical application of reference network planning. Most of the existing planning models in academic research take cost as the objective function. Although various advanced models and methods are proposed based on this, they are rarely applied in actual power companies. In this paper, a new reference network planning model is proposed according to the actual demand. According to the field investigation, "power supply to the nearest load" is taken as the goal, and the load moment is expressed analytically. In order to meet the increasing demand of renewable energy integrating into the power grid, the concept of acceptable disturbance range is added to the model constraint to improve the system's absorption capacity of renewable energy. Finally, the N-1 security constraint is considered to improve the reliability of the model. The model is transformed into a mixed integer linear programming (MILP)problem by priority objective programming method and can be solved with mature commercial solvers. The validity of the model is verified by IEEE-RTS24 node system. When N-1 safety constraints are taken into account, the advantages of the proposed model become apparent, with a total cost reduction of about 2.5%.
暂无评论