咨询与建议

限定检索结果

文献类型

  • 3 篇 期刊文献
  • 1 篇 会议

馆藏范围

  • 4 篇 电子文献
  • 0 种 纸本馆藏

日期分布

学科分类号

  • 3 篇 管理学
    • 3 篇 管理科学与工程(可...
    • 1 篇 工商管理
  • 2 篇 工学
  • 1 篇 经济学
    • 1 篇 应用经济学

主题

  • 1 篇 fly ash
  • 1 篇 access road
  • 1 篇 motorcycle colli...
  • 1 篇 generalized addi...
  • 1 篇 budget control
  • 1 篇 collector road
  • 1 篇 concrete
  • 1 篇 compressive stre...
  • 1 篇 gaussian distrib...
  • 1 篇 upv test.
  • 1 篇 logarithmic link...

机构

  • 1 篇 civil engineerin...
  • 1 篇 diploma 4 study ...
  • 1 篇 lecturer diploma...
  • 1 篇 the diploma prog...

作者

  • 1 篇 amin bakhtiar
  • 1 篇 miswardi t.
  • 1 篇 machsus machsus
  • 1 篇 t. miswardi
  • 1 篇 ridho bayuaji
  • 1 篇 anwar chairil
  • 1 篇 ismail saud
  • 1 篇 chomaedhi
  • 1 篇 rachmad basuki
  • 1 篇 chairil anwar
  • 1 篇 nur ahmad husin
  • 1 篇 amalia firdaus m...
  • 1 篇 bakhtiar amin
  • 1 篇 m. sigit darmawa...

语言

  • 4 篇 英文
检索条件"机构=Civil Engineering Diploma Program"
4 条 记 录,以下是1-10 订阅
排序:
Evaluation of cost and time control in Lhokseumawe City improvement project using earned value method (Case Study Street Alue Raya-Line Pipa)
Evaluation of cost and time control in Lhokseumawe City impr...
收藏 引用
International Conference on Science and Innovated engineering 2018, i-COSINE 2018
作者: Amin, Bakhtiar Anwar, Chairil Miswardi, T. Diploma 4 Study Program Road and Bridge Construction Engineering Civil Engineering Department Politeknik Negeri Lhokseumawe Jl. Banda Aceh-Medan Km.280 Buketrata Indonesia
The purpose of this study is to evaluate the amount of cost and use of time that has been used in the Improvement Project Street Alue Raya-Line Pipa Lhokseumawe City. The method that used in this study is the concept ... 详细信息
来源: 评论
Evaluation of cost and time control in Lhokseumawe City improvement project using earned value method (Case Study Street Alue Raya-Line Pipa)
收藏 引用
IOP Conference Series: Materials Science and engineering 2019年 第1期536卷
作者: Bakhtiar Amin Chairil Anwar T. Miswardi Lecturer Diploma 4 Study Program Road and Bridge Construction Engineering Civil Engineering Department Politeknik Negeri Lhokseumawe Jl. Banda Aceh-Medan Km.280 Buketrata
The purpose of this study is to evaluate the amount of cost and use of time that has been used in the Improvement Project Street Alue Raya-Line Pipa Lhokseumawe City. The method that used in this study is the concept ...
来源: 评论
Generalized Additive Models for Estimating Motorcycle Collisions on Collector Roads
收藏 引用
Procedia engineering 2015年 125卷 411-416页
作者: Machsus Machsus Rachmad Basuki Amalia Firdaus Mawardi The Diploma Program of Civil Engineering Institut Teknologi Sepuluh Nopember Surabaya East Java 60294 Indonesia
In the recent years, the frequency of motorcycle collision in Indonesia, especially in Surabaya, is constantly increasing. This article will explain the use of the Generalized Additive Models (GAMs) to estimate motorc... 详细信息
来源: 评论
A Case Study of Low Compressive Strength of Concrete Containing Fly Ash in East Java Indonesia
收藏 引用
Procedia engineering 2015年 125卷 579-586页
作者: M. Sigit Darmawan Ridho Bayuaji Nur Ahmad Husin Chomaedhi Ismail Saud Civil Engineering Diploma Program Institut Teknologi Sepuluh Nopember Kampus Sukolilo Surabaya 60111 Indonesia
The utilization of fly ash (FA) into concrete has become a common practice in ready mix concrete production throughout the world, including Indonesia. The inclusion of this by product material into concrete has two ma... 详细信息
来源: 评论