This paper proposes a multi-scale control scheme aimed at controlling speed, dwell time, and charging time of electric and automated buses performing the transport service on lines where there are no reserved lanes. T...
详细信息
The ultra-dense network (UDN) concept with multi-connectivity (MC) has emerged as a promising scenario for millimeter-wave (mmWave) communications due to its synergistic effect. However, mmWave UDNs with MC face chall...
详细信息
A novel e-Gear selector single-electrode-based triboelectric nanogenerator (TENG) was successfully designed, fabricated, and tested on flexible substrates. The proposed device consists of four TENG sensors representin...
详细信息
The rapid advancements in artificial intelligence (AI) and machine learning (ML) have significantly enhanced progress in computer vision, opening doors to innovative technological possibilities and enabling a range of...
详细信息
Bi-level optimization methods in machine learning are popularly effective in subdomains of neural architecture search, data reweighting, etc. However, most of these methods do not factor in variations in learning diff...
详细信息
In this paper, we derive the fundamental limits of low earth orbit (LEO) enabled localization by analyzing the available information in signals from multiple LEOs during different transmission time slots received on a...
详细信息
In this paper, we derive the fundamental limits of low earth orbit (LEO) enabled localization by analyzing the available information in signals from multiple LEOs during different transmission time slots received on a multiple antennas and evaluate the utility of these signals for 9D localization (3D position, 3D orientation, and 3D velocity estimation). We start by deriving the Fisher Information Matrix (FIM) for the channel parameters that are present in the signals received from LEOs in the same or multiple constellations during multiple transmission time slots. To accomplish this, we define a system model that captures i) time offset between LEOs caused by having relatively cheap clocks, ii) frequency offset between LEOs, iii) the unknown Doppler rate caused by high mobility LEOs, and iv) multiple transmission time slots from a particular LEO. We transform the FIM for the channel parameters to the FIM for the location parameters and determine the required conditions for localization. To do this, we start with the 3D localization cases: i) 3D positioning with known velocity and orientation, ii) 3D orientation estimation with known position and velocity, and iii) 3D velocity estimation with known position and orientation. Subsequently, we derive the FIM for the full 9D localization case (3D position, 3D orientation, and 3D velocity estimation) in terms of the FIM for the 3D localization. Using these results, we determine the number of LEOs, the operating frequency, the number of transmission time slots, and the number of receive antennas that allow for different levels of location estimation. We then provide insights into the interaction between the number of LEOs, the operating frequency, the number of transmission time slots, and the number of receive antennas. One key result is that in the presence of time and frequency offsets and Doppler rate, it is possible to perform 9D localization (3D position, 3D velocity, and 3D orientation estimation) of a receiver by
The expansion of flip-chip technologies and lack of backside protection made integrated circuits (ICs) vulnerable to certain classes of physical attacks mounted from the IC’s backside, including laser-assisted probin...
详细信息
Othello is a two-player combinatorial game with 1E+28 legal positions and 1E+58 game tree complexity. We propose a HIghly PArallel, Scalable and configurable hardware accelerator for evaluating the middle and endgame ...
详细信息
electrical system planning of the large-scale offshore wind farm is usually based on N-1 security for equipment lectotype. However, in this method, owing to the aggregation effect in large-scale offshore wind farms, o...
详细信息
electrical system planning of the large-scale offshore wind farm is usually based on N-1 security for equipment lectotype. However, in this method, owing to the aggregation effect in large-scale offshore wind farms, offshore electrical equipment operates under low load for long periods, thus wasting resources. In this paper, we propose a method for electrical system planning of the large-scale offshore wind farm based on the N+ design. A planning model based on the power-limited operation of wind turbines under the N+ design is constructed, and a solution is derived with the optimization of the upper power limits of wind turbines. A comprehensive evaluation and game analysis of the economy, risk of wind abandonment, and environmental sustainability of the planned offshore electrical systems have been conducted. Moreover, the planning of an infield collector system, substation, and transmission system of an offshore electrical system based on the N+ design is integrated. For a domestic offshore wind farm, evaluation results show that the proposed planning method can improve the efficiency of wind energy utilization while greatly reducing the investment cost of the electrical system.
暂无评论