For the simulation of large-scale AC/DC hybrid systems, both the precision of the DC parts and the efficiency of the whole system should be considered. Thus a real-time hybrid transient simulation platform is proposed...
详细信息
For the simulation of large-scale AC/DC hybrid systems, both the precision of the DC parts and the efficiency of the whole system should be considered. Thus a real-time hybrid transient simulation platform is proposed by combining the real-time digital simulator (RTDS) and a transient stability analysis (TSA) program. A latest GTFPGA card is used to realize the high speed digital communication between RTDS and the computer deploying TSA program. Moreover, the frequency dependent network equivalent (FDNE) is implemented in this simulation platform to improve the accuracy of simulation results. By simulating a modified New England 39-bus test system incorporating high-voltage direct current (HVDC) components, the validity of the proposed simulation platform is verified.
For PD pattern recognition, six kinds of typical cable fault models are made and tested. Characteristics are calculated from test data. Multiple statistical characteristics of PD distribution map are calculated and pa...
详细信息
With large-scale electric vehicles (EVs) integrated into the power system, how to optimize EV charging power in real time to avoid incremental peak load and achieve valley-filling will be important. The regular real-t...
详细信息
Look-ahead generation dispatch is a critical measurement to accommodate large-scale integration of wind power generation. In real application, the model for conventional generators should involve generation regulation...
详细信息
Look-ahead generation dispatch is a critical measurement to accommodate large-scale integration of wind power generation. In real application, the model for conventional generators should involve generation regulation constraints including regulation frequency constraints and discrete output constraints. Look-ahead generation dispatch with regulation constraints is a large-scale nonlinear mixed-integer programming problem, and it could be hardly solved strictly within acceptable time. An efficient three-stage method for solving this problem is developed, together with a forward-backward-pass dynamic programming approach for handling generation regulation constraints. Numerical tests are taken on IEEE 31-bus systems and a large-scale 264-bus power system to verify the high efficiency and practicability of the proposed method.
With the ever-increasing size of the power grid and the large-scale integration of stochastic renewable energy, the conventional active power dispatch method has become inapplicable. Therefore, a model predictive cont...
详细信息
Large-scale wind power integration imposes technical challenges to the power system operation and scheduling. Traditional deterministic generation dispatch methods cannot ensure system operation security because they ...
详细信息
An agile and coordinated voltage control method is proposed to deal with the power system reactive power and voltage operation with large scale wind power integration. In the provincial control center, the agile volta...
详细信息
Energy management system (EMS), known as the brain of power grid, utilizes information flow to control energy flow so as to keep power grid operation efficient and secure. Conventionally, the EMS is a centralized one ...
详细信息
Nowadays, the concentrating solar power (CSP) plant with thermal storage is a new way to utilize solar power. By making full use of large-capacity CSP devices, the CSP system is able to translate the solar power absor...
详细信息
Hydropower is the most widely used renewable energy for electricity generation in China, and small hydro power plant (SHPP) is a flexible way of electricity generation in water-rich remote area. Voltage at the end of ...