generation Expansion Planning (GEP), electricity market, and grid operation of the power system require a high spatial and temporal resolution model. However, limited data availability is the main obstacle to building...
详细信息
Along with the power fluctuation and other problems caused by large-scale grid connection of renewable energy, electrochemical energy storage has been widely concerned by researchers. Firstly, the technical characteri...
详细信息
Activated red mud(RM)has been proved to be a promising base material for the selective catalysis reduction(SCR)of *** inherent low reducibility and acidity limited its low-temperature *** this work,molybdenum oxide,tu...
详细信息
Activated red mud(RM)has been proved to be a promising base material for the selective catalysis reduction(SCR)of *** inherent low reducibility and acidity limited its low-temperature *** this work,molybdenum oxide,tungsten oxide,and cerium oxide were used to reconfigure the redox sites and acid sites of red mud based *** activated red mud was reconfigured by cerium-tungsten oxide(Ce-W@RM),the NOx conversion kept above 90%at 219-480℃.The existence of Ce^(3+)/Ce^(4+) redox electron pairs provided more surface adsorbed oxygen(O_(α)) and served as a redox *** interactions between Ce,W species and Fe oxide in red mud occurred,which led to the formation of unsaturated chemical bond and promoted the activation of adsorbed NH_(3) ***_(3) and Ce_(2)(WO_(4))_(3)(formed by solid-state reaction between Ce and W species)could provide more Brønsted acid sites(W-O modes of WO_(3),W=O or W-O-W modes of Ce_(2)(WO_(4))_(3)).CeO_(2) species could provide more Lewis acid *** Langmuir-Hinshelwood(L-H)routes and Eley-Rideal(E-R)routes occurred in the low-temperature SCR reaction on the Ce-W@RM ***_(4)^(+) species on Brønsted acid sites,NH_(3) species on Lewis acid sites,bidentate nitrate and bridging nitrate species were key active intermediates species.
The harmonic amplitude may exceed the limit when the large scale of wind farm is connected to the weak AC system through AC submarine cable. The harmonic with high amplitude will endanger the safety of powerequipment...
详细信息
With the continuous advancement of the construction of new powersystems, the data information of the power system is increasing exponentially, and the spatiotemporal distribution of the use of smart terminals and ele...
详细信息
Transient stability assessment(TSA)is of great importance in power system operation and *** of the usual tasks in TSA is to estimate the critical clearing time(CCT)of a given fault under the given network topology and...
详细信息
Transient stability assessment(TSA)is of great importance in power system operation and *** of the usual tasks in TSA is to estimate the critical clearing time(CCT)of a given fault under the given network topology and pre-fault power ***-driven methods try to obtain models describing the mapping between these factors and the CCT from a large number of ***,the influence of network topology on CCT is hard to be analyzed and is often ignored,which makes the models inaccurate and *** this paper,a novel data-driven TSA model combining Mahalanobis kernel regression and ensemble learning is proposed to deal with the *** model is a weighted sum of several *** sub-model only uses the data of one topology to construct a kernel *** weights are determined by both the topological similarity and numerical similarity between the *** similarities are decided by the parameters in Mahalanobis distance,and the parameters are to be *** reduce the model complexity,sub-models within the same topology category share the same *** estimating CCT,the model uses not only the sub-model which the sample topology belongs to,but also other ***,it avoids the problem that there may be too few data under some *** also efficiently utilizes information of data under all the ***,its decision-making process is clear and understandable,and an effective training algorithm is also *** results on both the IEEE 10-machine 39-bus and a real system verify the effectiveness of the proposed model.
Static DC and PR are typical operation conditions of HVDC converter transformer bushing outlet device, moreover, the electrical parameters of RIP, transformer oil and OIP have the nonlinear relationship with E-field s...
Static DC and PR are typical operation conditions of HVDC converter transformer bushing outlet device, moreover, the electrical parameters of RIP, transformer oil and OIP have the nonlinear relationship with E-field stress and temperature. Under the temperature gradient, the electrical parameters will modify the static DC and PR E-field distribution of the composite insulation. In order to simulate static DC and PR electric field of the composite insulation structure, this paper established the full model of the converter transformer outlet. Then, the structure parameters of converter transformer outlet have been optimized using combined RBF neural network and NSGA-II algorithm. Moreover, electric field verification calculation has been carried out under AC and PR conditions. The results show that under uniform temperature condition, E-field strength is larger than that under iso-thermal condition. The overshoot coefficient of the bushing end and barrier reach 65% and 45%, respectively. The study can provide reference for the design of outlet structure of the converter transformer.
A solid oxide fuel cell after long-term operation more than 5000 hours, nickel (Ni) phase is observed at YSZ/YSZ grain boundaries (GBs) within electrolyte. By using a humidified hydrogen, the single cell is electroche...
详细信息
In the conversion toward a clear and sustainable energy system, the flexibility of power-to-hydrogen (P2H) production enables the admittance of volatile renewable energies on a utility scale and provides the connected...
详细信息
Aiming at the power allocation problem of multiple energy storage power stations distributed at different locations in the regional power grid participating in frequency modulation services, a frequency modulation pow...
Aiming at the power allocation problem of multiple energy storage power stations distributed at different locations in the regional power grid participating in frequency modulation services, a frequency modulation power optimization allocation strategy for multiple energy storage systems considering the dual constraints of frequency modulation cost and frequency modulation capability is proposed. Firstly, a multi-objective optimization allocation model for frequency modulation power is constructed with the minimum frequency modulation cost and minimum deviation of the state of charge (SOC) for energy storage power plants. Secondly, using Pareto based multi-objective genetic algorithm (MOGA) to solve the model, introduce adaptive weight coefficients and fuzzy membership functions for each objective function regarding the frequency regulation demand of the power grid and the deviation of the SOC of energy storage stations, construct a comprehensive satisfaction function to make decisions on the most advantageous points on the Pareto frontier, in order to obtain the optimal output of each energy storage station that can adapt to the frequency regulation requirements of the power grid. Finally, simulation analysis was conducted on the proposed strategy in this article, and the results showed that: The proposed strategy not only enhances the frequency regulation economy of the regional power grid, but also helps to restore the SOC of the energy storage power station.